BUILT WITH PRECISION

DELIVERING IMPACT ACROSS INDONESIA
From the western tip of Sumatra to the eastern edge of Papua, our work spans the vast archipelago. Each project we undertake is a testament to our commitment to quality, innovation, and collaboration. This map highlights key locations where PT. Athiras Sarana Konstruksi has contributed to critical infrastructure, energy, industrial, and public sector developments—building lasting value for clients and communities across the nation.
- 2010:
- Jembatan Tol Cikampek STA 14+225 | Analisa Beban Tronton | PT Ciganda Jaya Perkasa | PT Jasa Marga
- 2013:
- PLTU Nagan Raya CFSPP 2×110 MW | Main Gate & Landscape Design | Synohidro | PT PLN (Persero)
- 2014:
- Pusri II-B – Tower Crane Foundation | Calculation for Tower Crane on Prilling Tower Area | PT Teknik Lancar Mandiri (IKPT/TOYO) | PT Pupuk Sriwidjaya
- 2015:
- PLTU Pangkalan Susu Unit 3&4 CFSPP 2×200 MW | New Rebar Arrangement & Windshield Starter Bars | PT Teknik Lancar Mandiri (Sinohydro) | PT PLN Persero
- PLTU Pangkalan Susu Unit 3&4 CFSPP 2×200 MW | Chimney Lifting Beam & Review of Heavy‑Lift Lugs | PT Teknik Lancar Mandiri (Sinohydro) | PT PLN Persero
- 2016:
- Cement Storage – Gosowong Project | Engineering Design for Cement Storage | PT Manado Teknik Mandiri | PT Nusa Halmahera Minerals
- Amphiteatre Manado | Shopdrawing Steel Structure | PT Supra Surya Indonesia | PT Manado Teknik Mandiri
- PLTU Batam 2×60 MW | Proposal Engineering Design – Chimney | PT Teknik Lancar Mandiri | IEG (Istro Energo Group)
- Asrama Conch 3 Building | Bill of Quantity Calculation | PT Manado Teknik Mandiri | —
- Bendungan Wae Ela | Soil Investigation | Thalweg Indonesia | —
- Vanilla Stack RAPP | Preliminary Stack Design | PT Teknik Lancar Mandiri | PT Sateri Viscose International
- 2019:
- PLTU Bengkulu 2×100 MW | Chimney Lifting Beam Design | PT Teknik Lancar Mandiri | PT PLN Persero
- PLTU Sulut 2×50 MW | Admin Building Engineering Design (Civil, HVAC, Electrical, Plumbing) | PT Teknik Lancar Mandiri (TLM/Sinohydro) | PT Minahasa Cahaya Lestari (MCL)
- PLTU Sulut 2×50 MW | Camp & Dormitory Design | PT Teknik Lancar Mandiri (TLM/Sinohydro) | PT Minahasa Cahaya Lestari (MCL)
- 2020:
- Bandara Hasanuddin, Makassar | Temporary Shoring Design | PT Teknik Lancar Mandiri (TLM/WIKA) | PT Angkasa Pura
- PLTP Muaralaboh 1×85 MW | Sampling Point & Piping Installation | PT Nurman Mitra Sentosa (NMS) | PT Supreme Energy Muaralaboh (SEML)
- 2021:
- PLTU Palu-3 2×50 MW | Preliminary Chimney Tower Design | PT Teknik Lancar Mandiri (TLM/WIKA) | PT PLN Persero
- 2023:
- MMP Nickel Smelter Project | Detail Engineering Design – SWRO Package | PT Gapura Liqua Solutions | Mitra Murni Perkasa
- Masjid Agung Medan, Sumut | Structural Design Review – Minaret Tower | Panitia Pembangunan Masjid Agung Medan | Panitia Pembangunan Masjid Agung Medan
- 2024:
- Temporary Storage of Copper Concentrate | Engineering Design Review – Temporary Storage | PT Teknik Lancar Mandiri | AMMAN
- Water Treatment Plant & Andaru Building | Slope Stability Engineering for Plant Area | PT Gapura Liqua Solutions | Golden Energy Mines